Articles in this section

How to edit a production shift

SUMMARY

Use this guide to modify an existing production shift in the scheduler to update timing or details.

 

WHEN TO USE THIS

  • Use this guide if:

    • You need to change shift timing or name

    • A shift was created with incorrect details

PREREQUISITES

  • Before starting:

    • A shift already exists in the scheduler

    • You have access to the line schedule

STEPS

  1. Open the line scheduler.

  2. Click the existing shift block.

  3. Click on the pencil.

  4. Update the shift details.

  5. Click Save.

    Screenshot 2024-12-19 at 10.03.10.png

     

EXPECTED RESULT

  • After completing these steps:

    • The shift reflects the updated details in the scheduler
       

TROUBLESHOOTING

  • Issue: Changes not saved

    • Try: Ensure all required fields are filled

    • Try: Save again
       

STILL NEED HELP?

  • Contact Support and include:

    • Shift name

    • Screenshot of the issue
       

RELATED ARTICLES

Was this article helpful?
0 out of 0 found this helpful