Articles in this section

Can I change the OEE type that is shown in operator view?

ANSWER

  • Yes. You can change the OEE type displayed in Operator View by updating the Weekly Target OEE Type configured in the line schedule settings. 

    Screenshot 2025-11-26 at 14.35.56.png

ADDITIONAL DETAILS

  • The OEE type shown in Operator View is determined by the Weekly Target OEE Type configured for the production line.
  • Changing this setting updates the OEE type displayed to operators for that line.

LIMITATIONS (if applicable)

  • The OEE type is configured in the Line Schedule settings.
  • Changes apply to the configured production line.
  • You must have permission to modify the line schedule.