ANSWER
- Yes. You can change the OEE type displayed in Operator View by updating the Weekly Target OEE Type configured in the line schedule settings.
ADDITIONAL DETAILS
- The OEE type shown in Operator View is determined by the Weekly Target OEE Type configured for the production line.
- Changing this setting updates the OEE type displayed to operators for that line.
LIMITATIONS (if applicable)
- The OEE type is configured in the Line Schedule settings.
- Changes apply to the configured production line.
- You must have permission to modify the line schedule.
RELATED ARTICLES
- How to hide OEE types
- What is Overall Equipment Effectiveness(OEE)?
- What calculations do you use for OEE?